Make a room-by-room schedule
Give each opening a reference that appears on the architectural plans. Record whether it will need privacy, glare control, room darkening or a combination. Include the intended control point, nearby doors and any future treatment planned for rooms that will be finished later.
Bring trades together before rough-in
Ask the shade specialist, builder and appropriate electrical trade to review the selected motor and its documented requirements. Recesses and pockets need enough space for installation and service as well as the finished assembly. Agree who will coordinate blocking, access and finishes, and record the decision against each opening.
Measure again after finishing
Drawing dimensions support planning. The finished frame, trim and sill determine the final fabrication dimensions. Arrange a measurement visit at the appropriate construction stage and confirm the fabric and finish choices against actual samples. Keep the signed schedule with the house documents for commissioning and future additions.
