Arrange the right people
Book access for the installer and any authorized building representative. If work affects a busy public opening, coordinate visitor arrangements and the installation window with site management. Confirm which prerequisites in the proposal are complete and who can sign off on changes discovered at the opening.
Check the agreed operating sequence
With the responsible professionals present, demonstrate normal staff entry, visitor access and the building’s approved exit arrangements. Include any accessibility functions affected by the work. Compare what happens at the door with the written schedule and verify that the management interface shows the correct site and door names.
Hand over administration carefully
Have an authorized manager practise issuing a sample credential, changing a permitted schedule and finding an example event. Record who controls the account, how another authorized administrator is added and whom to contact for a door problem. Keep manufacturer information, service contacts and the as-installed door schedule with the building records.